Install hoarding and warning signs to create a "drop zone" exclusion area, preventing unauthorized access.
Spool out and spool off the hoist rope from the drum. Lower the hook block to the ground, unreeve it, and coil the wire rope for transport. Step 5.4: Counterweight Removal (Partial/Total per Manual) tower crane dismantling method statement
(or local equivalent lifting and crane regulations). BS 7121 Code of Practice for Safe Use of Cranes . Install hoarding and warning signs to create a
A comprehensive method statement for tower crane dismantling serves as the definitive guide for a complex and hazardous operation. It is not merely a procedural document but a . From the initial site preparation and installation of guardrails to the final removal of the last bolt, every step must be executed with precision and in strict accordance with regulatory standards. Step 5
All small hand tools, pins, and wrenches must be secured via lanyards to the rigger's tool belt. No loose items are permitted on the crane structure during disassembly. Emergency Response Plan
Attach the mobile crane hook to the designated lifting points of the first counterweight block as specified by the manufacturer.